2 inch sprinkler solenoid valves for Agricutlure and Garden watering irrigation project
Product Description
JF-EVA200/EVD200 solenoid valve is suitable for irrigation systems in agriculture, landscaping, golf, and sports fields, as well as municipal pipeline water supply systems
Valve Features
·Passed 15.5Bar pressure test,opens normally under high pressure
·Reverse water flow design saves more water and has lower failure rate
·Equipped with manual adjustment switch,the valve can be opened andclosed at any time
·High-strength nylon filled glass fiber structure,special stainless steelstructure,embedded brass nut
·Manual flow adjustment
Interface:2"BSPinternal thread
Working Pressure:0.5-8Bar
Flow Range:9.08-34.05m³/h
Liquid Temperature:≤60ºC
Valve Body Material:Nylon filled with glass fiber
Diaphragm Material:EPDM rubber
ACSolenoid Head:
Drive Voltage:AC24V±10%,50/60HZ
Opening Current:0.3A
Holding Current:0.18A
DCSolenoid Head:Drive Voltage:DC12V±10%(9-15V),pulse width<100MSDrive Current:<2A
Product Parameters
Head Loss Curve |
Flow Rate |
m³/hr |
9.00 |
12.00 |
15.00 |
18.00 |
21.00 |
24.00 |
27.00 |
30.00 |
34.00 |
Pressure Loss |
Bar |
0.08 |
0.12 |
0.17 |
0.24 |
0.33 |
0.43 |
0.54 |
0.66 |
0.83 |
Function Introduction
1.Flow Control Valve:
a.Manual flow adjustment,clockwise to reduce,counterclockwise to increase;
b.Manual closing of solenoid valve
2.ManualSwitch:When the switch is vertical,it isin the open state,and the solenoid head isinvalid;when the switch is horizontal,itisin the closed state,and the solenoid head is available
3.Strong durability,resistance to chemical corrosion and cavitation
4.Smooth opening,effectively preventing water hammer damage
5.Multi-function selection can adaptto a variety of irrigation controllers

Company Profile
Our company is a professional facility agriculture and water-saving irrigation installation and design company for more then10 years. Our team has 2 chief engineers, 6 engineers, 6 projectmanagers, and 12 techniciansUndertake all kinds of irrigation,water and fertilizer integration smart digital agriculture,agricultural Internet of Things project engineering design andconstruction. And We have4000 square meters of qualityinspection workshop.we have strong supplier internet and strongTechnical Support For our customersWe Provide one-stoppackaging service for projects, welcome to call.
NOTICE
1. Please flush the pipeline before installation.
2. Please strictly follow the direction of water flow to install the valve. Reverse installation will cause the equipment to become unusable or even damaged.
3. After the installation of the valve and pipeline, open the flow regulating switch (counterclockwise rotation), open the normally open switch, and test the water.
4. Correctly connect the electromagnetic head cable
How to Order
Please specify the requested valve in the following sequence: (for more options, refer to Ordering Guide.)
FAQ
1.What is your MOQ?
Our MOQ is usually 1 CTNS /6PIECES
2.What is your delievery time?
The time of delievery is around 15-30days.
3.What is your payment terms?
We accept 30% T/T in advance,70% before shipment .or 100% L/C.
4.What is the shipping port?
We ship the goods to Ningbo or Shanghai port.
5.How about the samples?
we could send you the samples for free, and you need to pay the courier fee.
If there are too much samples, then you also need to undertake the sample fee.